Bathroom remodeling
Complete bathroom remodels from demolition to final trim: layout changes, framing, drywall, vanities, tile, shower glass & exhaust fans, with licensed plumbers & electricians for the trade work.
Planning the design first? Kitchen & Bathroom Design
What’s included
All servicesEverything from taking the old room out to the last piece of trim going on.
Demolition
The old bathroom taken out down to what’s worth keeping.
Layout changes & framing
Walls, fixtures and doors moved to suit the new plan.
Drywall
New walls and ceilings, given time to dry before finishes go on.
Vanities
New vanities, tops and fixtures.
Tile & waterproofing
Tile floors and showers on one complete waterproofing system. See Shower Remodels.
Shower glass
Custom shower glass, made after final measurements.
Exhaust fans
New exhaust fans to clear moisture from the room.
Plumbing & electrical
Trade work done by licensed plumbers & electricians.
Accessible bathrooms
Curbless showers, grab bars and wider doors for any age or ability. See Aging-in-Place Remodeling.
Heated floors
Warm tile underfoot, if you want it. See Radiant Heated Floors.
One team, start to finish
Free Consultation
We walk the space with you, listen to what you want & measure everything. The consultation costs nothing.
Written Proposal
A clear, line-by-line proposal with scope, schedule & payment milestones. Any change is agreed in writing first.
Build & Walkthrough
One accountable team on site, a final walkthrough together & a 1-year workmanship warranty on our installation.
Common questions
How much does a bathroom remodel cost?
It depends on the size of the room, whether plumbing moves, the tile you choose and the waterproofing system. After a free site visit we give you a written, line-by-line proposal with the price, schedule and payment milestones, so you know the cost before any work starts.
How long does a bathroom remodel take?
Most full bathroom remodels take about 3–4 weeks on site. That leaves time for drywall to dry, a 24–72 hour flood test of the shower, new flooring to acclimate, and custom shower glass to be made after final measurements.
How do you make sure a tile shower won’t leak?
Every shower gets one complete manufacturer waterproofing system: pan, membrane, seams, corners and drain from the same maker, installed to their instructions. Before any tile goes on, we flood-test the shower for 24–72 hours and give you dated photos of the test.
What warranty do you offer?
A 1-year workmanship warranty: for one year from completion, we repair at no cost any defect caused by our installation, including leaks from shower waterproofing we installed. Manufacturer warranties on the products we install pass through to you.
What happens if you find a problem behind the walls?
We stop, show you what we found and write it up as a change order before any extra work begins. No surprise bills and no verbal add-ons, and any allowance you don’t use is credited back to you.
Do you work in condos and HOA buildings?
Yes. We follow your HOA’s rules for work hours and common areas, protect floors and hallways, and clean up every day. For upper-floor units we can install acoustic underlayment to cut noise to the unit below.
Is the consultation really free?
Yes. We walk the space with you, listen to what you want and measure everything, and the consultation costs nothing.
Start your project
Tell us about your bathroom and what you’d like to change. We’ll walk the space with you and measure everything.